15.01.2025 12:28
Shipment being prepared by the postman
Etail Centre
15.01.2025 01:42
Processing information input
China
14.01.2025 14:55
Departed from [Dongguan international operational department], next stop [ center]
ORD
14.01.2025 04:09
Acceptance
VD
13.01.2025 17:23
Shipment Arrived At Hub
ISC LOS ANGELES CA (USPS)
13.01.2025 06:37
The item has arrived at the domestic sorting centre
D4
12.01.2025 19:50
Departure
Howrah HO
12.01.2025 09:04
Accepted by carrier
Dongguan
11.01.2025 22:18
The shipment has arrived in the destination country/destination area
AVENEL, NJ, 07001
11.01.2025 11:31
Arrival at the Destination
Shenzhen
11.01.2025 00:45
Loaded on Delivery Vehicle
AZ, CHANDLER, 85225
10.01.2025 13:59
Arrived at [Guangzhou Jianggao processing team] (transit)
RALEIGH NC DISTRIBUTION CENTER
10.01.2025 03:13
Processed Through Facility
Beijing international mail exchange station, Beijing city
09.01.2025 16:26
Outbound in sorting center
GERMANY
09.01.2025 05:40
Arrived Shipping Partner Facility, USPS Awaiting Item
Ghaziabad Ma RMS TMO
08.01.2025 18:54
Received by the carrier
Miraj ICH
Tracking numbers examples: